No.
|
If
extra essential arrangements are made by Ginning & Pressing
factories for modernisation as under.
|
Extra
incentive rates payable.
|
|
1.
|
Pucca
Compound wall of 6 feet height with a room for watchman near factory
gate. |
Rs.1.00
per quintal of lint. |
|
2.
|
Pucca
Oatas for storing raw cotton and cotton seed:
Cement Concrete platform for keeping kapas and cotton seeds. Platform
should be 1.5 feet of height covered with bricks, stone block by
cement concrete. Iron hooks may be provided for four sides of the
platform and peaching by stone, around the platform. At the place
where 12(twelve), Double Roller Gin machine untis installed, one
month storage capacity means 6,000 quintals raw cotton or more storage
capacity is available.
|
Rs.0.30
paise per sq.ft. per month maximum for 6 months (Rs.1.00 per quintal
of lint.) |
|
3.
|
Overhead
Tank: Factory should provide overhead Watertank of minimum capacity
of 20,000 litres & it should be on more than 20 feet height with
Hidrunt pipe connections. |
Rs.0.50
paise per quintal of lint. |
| 4. |
If
road of cement or stone block measuring 4 feet width provided for
carrying cotton from cotton heap to Gin House. |
Rs.0.25
paise per quintal of lints. |
| 5. |
.If
road of cement or stone block measuring 6 feet width provided for
carrying cotton from cotton heap to Gin House. |
Rs.0.15
paise per quintal of lint. |
| 6. |
Pneumatic
suction pipe alongwith stone catcher for carrying cotton from cotton
heap to Ginning |
Rs.6.00
per quintal of lint. |
| 7. |
Installation
of Pre-cleaner for cleaning raw cotton. |
Rs.7.00
per quintal of lint. |
| 8. |
To
carry cotton from Pre-cleaner to Gin platform by pneumatic system
and installation of auto feeder. |
Rs.5.00
per qunital of lint. |
| 9. |
To
carry out lint by pneumatic system or conveyor from each Gin to end
of Gin House. |
Rs.10.00
per quintal of lint. |
| 10. |
To
carry out lint by conveyor or pneumatic system from Gin House to Pala
house. |
Rs.15.00
per quintal of lint. |
| 11. |
Installation
of cotton seed elevator or conveyor for carrying cottonseed by suction
pipe line from Gin House to Cottonseed heap. |
Rs.3.00
per quintal of lint. |
| 12. |
Arrangement
for required humidification for keeping humidity in Gin House. |
Rs.4.00
per quintal of lint. |
| 13. |
Arrangement
of lint pre-cleaner |
Rs.7.00
per FP Bale. |
| 14. |
Carrying
lint from Pala house to baling press through conveyor or pneumatic
suction pipe. |
Rs.7.00
per FP Bale. |
| 15. |
Pala
House
A) Size 30' x 40' (two) 2 Pala Houses, OR
B) Size 30' x 40' (four) 4 Pala Houses
|
Rs.6.00 per FP Bale.
Rs.10.00 per FP Bale. |
| 16. |
Installation
of Humidification in Pala House and Press house for keeping required
humidification. |
Rs.4.00
per FP Bale. |
| 17. |
Installation
of sprinklers in Pala House to extinguish fire. |
Rs.1.00
per FP Bale. |
| 18. |
Century
packing
Bale should be covered fully from all sides using extra side coverings
and if necessary by marking alteration in press box using essential
extra hessain cloth and engaging extra labourers. |
Rs.3.30
per FP Bale. |
|
N. G. Keley,
General Manager (PP)
|